During Development
The first phase required clearing trees and foliage, demolition of roughly 300 cubic yards of concrete, which consisted of 3/4 reinforced rebar, 2′ thick slab, 4′ deep footings, importing fill dirt and regrading area to match elevation and slope of surrounding parking lot. The second phase consisted of soil, class II base, asphalt, compaction, tacking, striping and spreading sand to protect the asphalt during its curing.
Finished Job
All spoils were loaded onto 20 cubic yard trucks and hauled away.